December of 2019 was an exceptionally busy time for Roil Projects Inc. We were right in the middle of a large 175 man Camp install on the ANC road in Northern Alberta, as well as a large tear out of an existing facility on the Simonette Road called the “Deep Valley Open Camp”.

What

About the Project

On top of those two large projects we were also awarded a single dorm install at Burton Creek in Southern Alberta, We certainly love a challenge and being that our three leads and two other supervisors were already busy with other projects, our General manager John Bradley took a small team and headed south in order to complete the Burton Creek job.

 

Usage 

Modular Construction

The company was tasked with a job scope that included:

  • the set and level on one complete single dorm which consisted of eight boxes
  • all finishing carpentry
  • mechanical work including electrical, plumbing and gas
  • final skirting

The job was completed safely, efficiently and on schedule. Humbly speaking, another reason why Roil Projects Inc. is rapidly becoming the most trusted choice in the modular construction industry